BUILD / 05

Prototypes & batch builds

Confirm the sample before the batch, with revisions, materials and delivery requirements aligned.

Use the approved sample as the starting point.

A sample build helps expose assembly questions; a batch needs stable documents and acceptance criteria. FHDT separates sample approval, change records, material readiness and batch release so temporary prototype fixes do not silently become repeat-build instructions.

Category and connection illustration, not a product photograph. For reference only.

What to clarify in the brief

Project brief checklist
Stage and quantityPrototype, revision or repeat order; sample quantity, planned volume and delivery batches.
Sample and agreed baselineApproved sample, BOM, drawings, software revision and unresolved issues.
Changes and materialsChanges, approval process, affected materials and treatment of the previous revision.
Batch and timingMaterial-readiness date, build sequence, check arrangements and staged handover.

Define the deliverables

Sample approval record

Record the sample status, corrections and decisions required before the batch.

Batch-build reference

Align revisions, materials, checks and delivery requirements, with later changes approved separately.

Before you start

Is there a fixed minimum order quantity?

Quantity requirements depend on operations, materials, fixtures and setup. Share the sample and batch plan so the quotation and schedule can be assessed against the scope.

Your next build starts with a clear brief.

Bring the drawings, sample notes and quantity plan together.

Prepare a project brief