BUILD / 05
Prototypes & batch builds
Confirm the sample before the batch, with revisions, materials and delivery requirements aligned.
Use the approved sample as the starting point.
A sample build helps expose assembly questions; a batch needs stable documents and acceptance criteria. FHDT separates sample approval, change records, material readiness and batch release so temporary prototype fixes do not silently become repeat-build instructions.
What to clarify in the brief
| Stage and quantity | Prototype, revision or repeat order; sample quantity, planned volume and delivery batches. |
|---|---|
| Sample and agreed baseline | Approved sample, BOM, drawings, software revision and unresolved issues. |
| Changes and materials | Changes, approval process, affected materials and treatment of the previous revision. |
| Batch and timing | Material-readiness date, build sequence, check arrangements and staged handover. |
Define the deliverables
Sample approval record
Record the sample status, corrections and decisions required before the batch.
Batch-build reference
Align revisions, materials, checks and delivery requirements, with later changes approved separately.
Before you start
Is there a fixed minimum order quantity?
Quantity requirements depend on operations, materials, fixtures and setup. Share the sample and batch plan so the quotation and schedule can be assessed against the scope.